NCS — Network Cabling Services Schedule a Consultation
Public Safety DAS · ERCES · For General Contractors

One Team for Installation, Testing, and AHJ Approval. No Third-Party Testers.

NCS now self-performs grid testing for Public Safety / Emergency Responder DAS (ERCES) — verifying code-compliant coverage in every corner of your building and delivering the documentation your fire marshal needs to sign off.

Get a Grid Testing Quote → Read the Blog

Self-performed grid testing starting at $1,000 — based on building size & complexity

Grid Test Level 2 Coverage Map showing pass and fail tiles
Why it matters on your project

No Passing Grid Test, No Certificate of Occupancy

If your building includes a Public Safety DAS, most Texas jurisdictions require a passing grid test before final inspection. A failed test late in the schedule means remediation, retesting, and delayed turnover.

Verify Coverage Everywhere

Grid testing measures signal strength across every part of the building — confirming reliable radio communication for first responders even where concrete, steel, and low-e glass block signal.

Catch Gaps Before Inspection

Stairwells, basements, and mechanical areas are the most common failure points. Identifying weak zones early prevents costly rework and delays at final inspection.

Prove Code Compliance

Testing documents compliance with IFC 510 and NFPA 1221/1225 coverage requirements — the evidence your AHJ needs to approve occupancy.

Streamline Project Closeout

A complete report package — coverage maps, data logs, calibration records, annotated floorplans — is delivered ready for AHJ submission alongside commissioning documents.

IFC 510 · Emergency Responder Radio Coverage NFPA 1221 / 1225 · Emergency Communications Systems AHJ-Ready · Documentation for Final Inspection
How it works

The Grid Testing Workflow

Schedule testing after DAS installation and before final inspection — with buffer for retesting and AHJ review.

01

Define the Grid

Each floor is divided into uniform tiles — tighter in stairwells and critical life-safety areas.

02

Calibrate Equipment

Spectrum analyzers are tuned to your jurisdiction’s emergency radio frequencies.

03

Collect Data

Technicians walk every grid cell, recording signal strength and quality metrics.

04

Analyze & Remediate

Weak zones are identified and corrected — often during the same mobilization.

05

Report for AHJ

You receive a complete, submission-ready compliance package for approval.

The self-performed advantage

Why GCs Choose One Team Instead of Three Subs

✓

Single point of contact

One team owns the DAS build and the verification — no coordinating a separate testing sub.

✓

Faster turnaround

Coverage gaps are identified and corrected during the same mobilization, not weeks later.

✓

Cost control

Bundling installation and testing reduces subcontractor overhead and markup stacking.

✓

Local AHJ experience

Our technicians know regional code interpretations and approval processes across Texas.

✓

Consistent quality

Calibrated equipment and standardized procedures aligned with AHJ expectations, every time.

New on the NCS blog

Why Grid Testing Matters for Public Safety DAS — and What It Means for Your Next Project

What a grid test is, how it supports IFC 510 and NFPA 1221/1225 compliance, why stairwells and basements fail most often, and how self-performed testing streamlines closeout.

Read the Full Article →
Get started

Have a Project with Public Safety DAS on the Spec?

Talk to our DAS experts about upcoming projects, grid testing scope, or a quote. Self-performed testing starts at $1,000, depending on building size and complexity.

Schedule a Consultation