Verify Coverage Everywhere
Grid testing measures signal strength across every part of the building — confirming reliable radio communication for first responders even where concrete, steel, and low-e glass block signal.
If your building includes a Public Safety DAS, most Texas jurisdictions require a passing grid test before final inspection. A failed test late in the schedule means remediation, retesting, and delayed turnover.
Grid testing measures signal strength across every part of the building — confirming reliable radio communication for first responders even where concrete, steel, and low-e glass block signal.
Stairwells, basements, and mechanical areas are the most common failure points. Identifying weak zones early prevents costly rework and delays at final inspection.
Testing documents compliance with IFC 510 and NFPA 1221/1225 coverage requirements — the evidence your AHJ needs to approve occupancy.
A complete report package — coverage maps, data logs, calibration records, annotated floorplans — is delivered ready for AHJ submission alongside commissioning documents.
Schedule testing after DAS installation and before final inspection — with buffer for retesting and AHJ review.
Each floor is divided into uniform tiles — tighter in stairwells and critical life-safety areas.
Spectrum analyzers are tuned to your jurisdiction’s emergency radio frequencies.
Technicians walk every grid cell, recording signal strength and quality metrics.
Weak zones are identified and corrected — often during the same mobilization.
You receive a complete, submission-ready compliance package for approval.
One team owns the DAS build and the verification — no coordinating a separate testing sub.
Coverage gaps are identified and corrected during the same mobilization, not weeks later.
Bundling installation and testing reduces subcontractor overhead and markup stacking.
Our technicians know regional code interpretations and approval processes across Texas.
Calibrated equipment and standardized procedures aligned with AHJ expectations, every time.
What a grid test is, how it supports IFC 510 and NFPA 1221/1225 compliance, why stairwells and basements fail most often, and how self-performed testing streamlines closeout.
Talk to our DAS experts about upcoming projects, grid testing scope, or a quote. Self-performed testing starts at $1,000, depending on building size and complexity.